CUPERTINO TECH CAMPUS

CUPERTINO TECH CAMPUS

 
 
 
 
UC MERCED 2020

UC MERCED 2020

The 1.2 million GSF project is being designed and built in three phases between 2016 and 2020. The project is being implemented as a master planned initiative developed by a world-class team of architects, planners, engineers and construction professionals. The design and construction budget is $1.3 billion and includes 13 buildings and supporting infrastructure. Every building will achieve at least a LEED Gold certification.

Project Link


Las Vegas Stadium


Project Videos